The Economics of TSMC’s Giga-Fabs - by Jon Y
asianometry.com · 2,686 words · saved by 2 readers
If you want to watch the video, it is below
The Economics of TSMC’s Giga-Fabs Jon Y Aug 31, 2022 45 Share If you want to watch the video, it is below In 2018, TSMC broke ground on Fab 18 near Tainan City in the south of Taiwan. Fab 18 is a monster. It sits on 103 acres and has a total floor space of 950,000 square meters (10.2 million square feet). That is about 3 times the size of AT&T Stadium in Texas - home of the Dallas Cowboys. (Thanks for the correction that the stadium isn’t actually in Dallas). In total, across all of its phases, Fab 18 will cost TSMC nearly $20 billion to build and operate. More than the cost of the USS Gerald
saved by
related reading
- How to Build a $20 Billion Semiconductor Fabconstruction-physics.com
- Re-engineering the Semiconductor Supply Chain with Intel CEO Lip Bu Tanyoutube.com
- TSMC Overseas Fabs – A Success?substack.com
- How ASML, TSMC And Intel Dominate The Chip Market | CNBC Marathonyoutube.com
- I Saw the Face of God in a TSMC Semiconductor Factory | WIREDwired.com
- Deep Dive: Building an American TSMC | Contrary Researchresearch.contrary.com
- The Insane Complexity of the Semiconductor Global Supply Chainyoutube.com
- Chip design from the bottom up – Reiner Popeyoutube.com
- Inside TSMC’s Phoenix, Arizona expansion struggles - Rest of Worldrestofworld.org
- China Will Never Beat Taiwan, Here’s Whyyoutube.com
- Abstract Warfare: How TSMC Made Its Own Marketkwokchain.com
- Jon Y (Asianometry) on Problems And Progress in Semiconductor Manufacturing - Hear This Ideahearthisidea.com